Prove It or Disprove It – Delay Claims Built (or Broken) on P6 Forensics
Whether you’re a contractor claiming EOT or an owner rejecting one, our Primavera P6 forensic analysis delivers court-grade evidence: isolating what delayed, who caused it, and how much is excusable/compensable—AACE 29R-03 & FIDIC compliant.
Dual-Sided Expertise
| For Contractors (Claimants) | For Owners (Defendants) |
|---|---|
| Build bulletproof EOT – Fragnets + TIA prove owner delays | Dismantle weak claims – Expose pacing, logic flaws, concurrency |
| Quantify prolongation – Link delays to cost-loaded activities | Protect float & mitigation – Show contractor failures absorbed impact |
| Win $10 M+ settlements – Contemporaneous updates as evidence | Slash payouts by 60 % – Concurrent delay tests neutralize excuses |
The 6-Step Forensic Process (P6-Powered)
- Data Lockdown – Audit baselines, updates, as-builts (Schedule Log flags issues)
- Baseline vs As-Built Overlay – Visual delay waterfall
- Event Isolation – Insert fragnets into pre-delay update
- Dynamic Recalc – TIA per event → critical path shift
- Concurrency Check – Multiple float paths prove parallels
- Claim Package – Claim Digger reports + EVM-linked costs + dashboards
Methods We Master: TIA (gold standard), Windows, Collapsed As-Built, Longest Path.
P6 Tools That Seal the Deal
- Claim Digger → Every logic/duration change tracked
- Fragnets → Model RFIs, changes, weather in <1 hour
- Monte Carlo Add-On → Risk-adjusted EOT (P80 confidence)
- Visualiser → Red-bar Gantts for arbitrators
Real Wins
| Case | Role | Outcome |
|---|---|---|
| $1.2 B LNG | Contractor | +112 days EOT / $38 M awarded (TIA fragnet) |
| $800 M Highway | Owner | Claim reduced 70 % – exposed 42-day pacing |
| $2 B Refinery | Both | Settled pre-arbitration via neutral forensics |
Why Us
- P6 delay experts – 20+ years
- Neutral or biased – We serve your side with data
- You own the .xer – Full transparency, no black boxes
- Sectors: Oil & gas, mining, rail, infrastructure