From Possession to Passenger Service – One Platform, Zero Disruptions
High-Speed · Freight · Metro · Signalling · Track Upgrades

We deliver Primavera P6 mastery tuned to rail’s heartbeatpossession windows, track laydown rates, signalling blocks, and ETCS integration—so your $500 M–$15 B corridor opens on the day the first train runs revenue.

Rail Tailored Services

ServiceRail Precision
Project PlanningPossession windows, 1.2 km/day track laydown, ETCS-to-revenue logic, cost-loaded slab track segments
Portfolio PlanningCross-corridor gangs & ballast trains, budget vs blockade cost, P80 across 200 km + stations
Integrated PlanningSingle living model: civils → track → OHL → signalling → testing → revenue service
Forensic Schedule AnalysisTIA on ROW delays, concurrent software freeze, possession overrun fragnets, FIDIC proof
Schedule QAZero SF relationships on slab track, possession calendar lock, blockade look-ahead logic
Coaching1-on-1 training: TPMS-to-P6 sync, 3-week blockade dashboards, EVM for staged openings

Rail Lifecycle – One P6 Thread

PhaseP6 Output
EnablingLand acquisition, utility diversions, compounds
CivilsEmbankments, viaducts, tunnel breakthrough
Track & OHLBallast → sleeper → rail → catenary tensioning
SignallingInterlocking, ETCS Level 2, trial running
CommissioningStaged block handovers, revenue service milestones

Rail Wins

MetricGain
Track lay forecast±1 % at 80 %
Possession overrun–11 nights
EOT claim (signalling)$19 M awarded
Gantry clashes0 %

Why Rail Giants Trust Us

  • 20+ years on $3 B+ HS2, metro, freight EPC
  • Certified: PMI-SP, AACE, Oracle P6, Risk
  • You own every .xer – full corridor handover
  • Fixed-fee audits – 48 hr turnaround

Contact

    Services

    Project Planning

    Engineering and construction project planning and scheduling services using Primavera. All project life cycle phases from concept through to commissioning.

    Portfolio Planning

    Structuring and aggregating data from multiple project schedules to monitor or improve overall portfolio performance.

    Integrated Planning

    Integrating the planning efforts of disparate teams to improve overall planning effectivness.

    Schedule Forensic Analysis

    Forensic analysis of project schedules to support or assess delay claims.

    Schedule QA

    Independent review of project schedule against company or industry norms and best practice.

    Coaching

    Assisting, guiding and coaching planners, schedulers and project controls professionals.