Mining

From Box-Cut to First Ore – One Platform, Zero Overruns
Open-Cut · Underground · Process Plants · Rail & Port

We deliver Primavera P6 mastery tuned to mining’s DNApit-to-port sequencing, 400 t excavator fleets, decline development, and ROM-to-mill logic—so your $500 M–$10 B mine hits first ore on the day the crusher spins.

Mining Tailored Services

ServiceMining Precision
Project PlanningBox-cut → pre-strip → crusher logic, 400 t excavator histograms, ROM pad float, cost-loaded decline meters
Portfolio PlanningFleet sharing (haul trucks, drills, shovels), capex roll-up across 5 pits, P80 risk across mine + rail + port
Integrated PlanningSingle living model: enabling works → pit dev → plant → rail loop → ship loader
Forensic Schedule AnalysisTIA on geotech slip, water ingress concurrency, dragline move fragnets, AACE proof
Schedule QAZero open ends on decline development, daily blast-to-load logic, haul road possession checks
Coaching1-on-1 training: ROM-to-mill dashboards, dragline relocation templates, EVM for pre-strip carry-over

Mining Lifecycle – One P6 Thread

PhaseP6 Output
EnablingAccess road, camp, power, water logic
Pit DevelopmentPre-strip m³, bench sequencing, blast-to-load
Plant & CrusherStructural → mechanical → wet commissioning
InfrastructureHaul roads, conveyor, rail spur milestones
Ramp-UpTonnes/day curve, grade control integration

Mining Wins

MetricGain
Pre-strip forecast±2 % at 60 %
Dragline move delay–14 days
EOT claim (water)$22 M awarded
Truck clashes0 %

Why Mining Giants Trust Us

  • 20+ years on $2 B+ iron ore, coal, copper EPC
  • Certified: PMI-SP, AACE, Oracle P6, Risk
  • You own every .xer – full pit-to-port handover
  • Fixed-fee audits – 48 hr turnaround

Contact

    Services

    Project Planning

    Engineering and construction project planning and scheduling services using Primavera. All project life cycle phases from concept through to commissioning.

    Portfolio Planning

    Structuring and aggregating data from multiple project schedules to monitor or improve overall portfolio performance.

    Integrated Planning

    Integrating the planning efforts of disparate teams to improve overall planning effectivness.

    Schedule Forensic Analysis

    Forensic analysis of project schedules to support or assess delay claims.

    Schedule QA

    Independent review of project schedule against company or industry norms and best practice.

    Coaching

    Assisting, guiding and coaching planners, schedulers and project controls professionals.