Primavera P6 Tailored for Your World
Oil & Gas · Mining · Rail · Infrastructure
Every industry runs on unique rhythms—module fabrication cycles, pit-to-port haul roads, possession windows, or phased land handovers.
Oil & Gas
Refineries · LNG Trains · FPSOs · Subsea Tiebacks
| Service | Oil & Gas Tailoring |
|---|---|
| Project Planning | FAT-to-sail logic, hook-up sequencing, SIMOPS risk, cost-loaded pipe spools |
| Portfolio Planning | Global pipe-mill capacity, FLNG module cash phasing, P80 across 12 offshore campaigns |
| Integrated Planning | One model from FEED → mechanical completion → first oil |
| Forensic Analysis | TIA on late P&IDs, weather standby fragnets, concurrent crane delays |
| Schedule QA | Zero lags on pressure test packs, 100 % resource-loaded for 400 t cranes |
| Coaching | Train planners on spool-to-isometric tracking, HUC dashboards |
Mining
Open-Cut · Underground · Process Plants · Port Load-Out
| Service | Mining Tailoring |
|---|---|
| Project Planning | Box-cut → pre-strip → crusher logic, 400 t excavator histograms |
| Portfolio Planning | Fleet sharing (haul trucks, drills), capex roll-up across 5 pits |
| Integrated Planning | Single EPS: mine → rail loop → ship loader |
| Forensic Analysis | Collapsed as-built on geotech slip, water ingress concurrency |
| Schedule QA | No open ends on decline development, ROM pad float checks |
| Coaching | Teach schedulers ROM-to-mill tracking, dragline move fragnet templates |
Rail
High-Speed · Freight · Metro · Signalling Upgrades
| Service | Rail Tailoring |
|---|---|
| Project Planning | Possession windows, track laydown (km/week), ETCS integration milestones |
| Portfolio Planning | Cross-corridor resource pools, 100 km ballast gangs, budget vs blockade cost |
| Integrated Planning | One model: civils → track → OHL → testing → revenue service |
| Forensic Analysis | TIA on ROW delays, concurrent signalling software freeze |
| Schedule QA | Zero SF relationships on slab track, possession calendar lock |
| Coaching | Train teams on blockade look-aheads, TPMS-to-P6 sync |
Infrastructure
Highways · Bridges · Tunnels · Airports · Water
| Service | Infrastructure Tailoring |
|---|---|
| Project Planning | Phased land handovers, utility diversion float, precast segment cycles |
| Portfolio Planning | Capex phasing across 200 km corridor, shared TBM fleet |
| Integrated Planning | Single WBS: enabling → structures → finishes → commissioning |
| Forensic Analysis | Windows method on archaeological finds, concurrent permit delays |
| Schedule QA | Max 20-day activities for 1 km roadbase, traffic switch logic checks |
| Coaching | Mentor planners on staged opening milestones, LA dash boards |
One P6 Backbone. Four Industry Hearts.
All services run on the same global codes, resource dictionary, and EPS standards—so your LNG module planner speaks the same language as your rail possession scheduler.