Infrastructure

From Enabling Works to Ribbon-Cut – One Platform, Zero Handover Chaos
Highways · Bridges · Tunnels · Airports · Water · Power

We deliver Primavera P6 mastery tuned to infrastructure’s pulsephased land handovers, utility diversions, precast cycles, and staged openings—so your $500 M–$20 B corridor, campus or plant opens on the day the public walks in.

Infrastructure Tailored Services

ServiceInfra Precision
Project PlanningPhased ROW handovers, utility diversion float, precast segment cycles, cost-loaded 1 km roadbase
Portfolio PlanningCapex phasing across 200 km, shared TBM fleet, P80 risk on tunnels + bridges
Integrated PlanningSingle living model: enabling → structures → finishes → systems → staged opening
Forensic Schedule AnalysisWindows on archaeology, concurrent permit delays, TBM breakdown fragnets, FIDIC proof
Schedule QAMax 20-day activities per pavement layer, traffic-switch logic, LA dashboard sync
Coaching1-on-1 training: staged opening dashboards, LA claim templates, EVM for early works carry-over

Infrastructure Lifecycle – One P6 Thread

PhaseP6 Output
EnablingSite clearance, temp roads, utility reroutes
StructuresPiling → piers → deck segments → bearings
FinishesPavement, barriers, lighting, signage
SystemsITS, SCADA, toll gantry integration
CommissioningLane-by-lane handovers, defect liability milestones

Infrastructure Wins

MetricGain
Segment cast forecast±2 % at 65 %
Utility delay–28 days
EOT claim (archaeology)$31 M awarded
Crane clashes0 %

Why Infra Giants Trust Us

  • 20+ years on $5 B+ motorways, airports, tunnels, grids
  • Certified: PMI-SP, AACE, Oracle P6, Risk
  • You own every .xer – full staged-opening handover
  • Fixed-fee audits – 48 hr turnaround

Contact

    Services

    Project Planning

    Engineering and construction project planning and scheduling services using Primavera. All project life cycle phases from concept through to commissioning.

    Portfolio Planning

    Structuring and aggregating data from multiple project schedules to monitor or improve overall portfolio performance.

    Integrated Planning

    Integrating the planning efforts of disparate teams to improve overall planning effectivness.

    Schedule Forensic Analysis

    Forensic analysis of project schedules to support or assess delay claims.

    Schedule QA

    Independent review of project schedule against company or industry norms and best practice.

    Coaching

    Assisting, guiding and coaching planners, schedulers and project controls professionals.