From FEED to First Oil – One Platform, Zero Surprises
LNG Trains · Refineries · FPSOs · Subsea · Pipelines

We deliver battle-proven Primavera P6 expertise tuned to the rhythms of fabrication yards, hook-up sequencing, SIMOPS, and pipe-mill bottlenecks—so your $1 B–$20 B projects hit mechanical completion on the day the rig arrives.

Oil & Gas Tailored Services

ServiceO&G Precision
Project PlanningFAT-to-sail logic, spool-to-isometric tracking, SIMOPS risk matrices, cost-loaded pressure test packs
Portfolio PlanningGlobal pipe-mill & FLNG module capacity, cash S-curves across 12 campaigns, P80 contingency roll-up
Integrated PlanningSingle living model: FEED → fab yard → load-out → offshore hook-up → first oil
Forensic Schedule AnalysisTIA on late P&IDs, weather standby fragnets, concurrent crane delays, AACE/FIDIC proof
Schedule QAZero lags on hydro-test packs, 400 t crane histograms, hook-up sequence float checks
Coaching1-on-1 training: spool tracking dashboards, HUC look-aheads, EVM for module carry-over

O&G Lifecycle – One P6 Thread

PhaseP6 Output
FEEDClass-3 cost, P50/P90 Monte Carlo, portfolio rank
Detail DesignIsometric release logic, long-lead pipe tracker
FabricationModule yard Level-3, daily welder histograms
Load-Out & SailWeight & CoG milestones, tide window constraints
Offshore HUCSIMOPS critical path, 3-week look-aheads
CommissioningSystem turnover sequence, punch-list WBS

Oil & Gas Wins

MetricGain
Hook-up float preserved+42 days
Module fab forecast±3 % at 70 %
EOT claim (late HAZOP)$38 M awarded
Crane clashes0 %

Why O&G Giants Trust Us

  • 20+ years on $2 B+ LNG, FPSO, refinery EPC
  • Certified: PMI-SP, AACE, Oracle P6, Risk
  • You own every .xer – full yard-to-offshore handover
  • Fixed-fee audits – 48 hr turnaround

Contact

    All Services

    Project Planning

    Engineering and construction project planning and scheduling services using Primavera. All project life cycle phases from concept through to commissioning.

    Portfolio Planning

    Structuring and aggregating data from multiple project schedules to monitor or improve overall portfolio performance.

    Integrated Planning

    Integrating the planning efforts of disparate teams to improve overall planning effectivness.

    Schedule Forensic Analysis

    Forensic analysis of project schedules to support or assess delay claims.

    Schedule QA

    Independent review of project schedule against company or industry norms and best practice.

    Coaching

    Assisting, guiding and coaching planners, schedulers and project controls professionals.