for Large, Complex Engineering & Construction Projects, Programmes & Portfolios
Integrated Planning is the single-source-of-truth discipline that fuses schedule, cost, risk, resources, scope, contracts, and performance data into one living, version-controlled model—typically built in Oracle Primavera P6—so that every decision is based on one coherent, real-time picture of the entire endeavour.
1. Why “Integrated” Matters at Scale
Fragmented Approach
Integrated Approach
Separate Excel schedules, cost spreadsheets, risk logs, EVM reports
One P6 database with cost-loaded, resource-driven activities linked to WBS, risk register, change orders, EV baselines
“Schedule says on-time, cost says over-budget”
CPI = 0.92, SPI = 0.88 calculated automatically from the same activity % complete
3-week lag to see impact of a scope change
What-if scenario run in <1 hour showing +14 days, +$2.1 M, 7% risk increase
2. Core Integration Pillars in Primavera P6
Pillar
What It Is
How It Connects in P6
Scope
WBS / EPS hierarchy
Activities roll up to control accounts; deliverables tied to milestones
Portfolio dashboards show combined CPI/SPI, risk heat-map, capital burn rate.
Scenario planning: “What if we accelerate Project A by 3 months—impact on cash and manpower?”
6. One Sentence Definition
Integrated Planning = a single, cost-loaded, resource-driven, risk-adjusted Primavera P6 model that synchronises scope, time, cost, and performance across every project, programme, and portfolio level—so stakeholders always act on the same version of the truth.